摘 要:簡(jiǎn)述了殼牌粉煤氣化裝置的工藝流程;分析了該裝置運(yùn)行2年來(lái)出現(xiàn)的問(wèn)題及原因;提出了相應(yīng)的技改方案及應(yīng)對(duì)措施;總結(jié)了技改效果。結(jié)果表明,隨著對(duì)殼牌煤氣化技術(shù)的消化吸收和再創(chuàng)新,龍宇煤化工有限公司的煤氣化裝置長(zhǎng)周期穩(wěn)定運(yùn)行的天數(shù)已逐步提高。
關(guān)鍵詞:殼牌粉煤氣化裝置;生產(chǎn)運(yùn)行;問(wèn)題;技改方案;應(yīng)對(duì)措施;效果
中圖分類(lèi)號(hào):TQ546 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1004-8901(2011)01-0027-03
Productive Operation and Technical Reformation Measures in Shell Coal Gasification Process Plant
REN Xiao-wane
(Longyu Coal Chemical-engineering Company Ltd.,Yongcheng Henan 476600 China)
Abstract:Author has briefly described the process flow of Shell pulverized coal Gasification plant;has analyzed the existing problems and its reasons since 2 running years of this plant;has presented the appropriate technical reformation schemes and counter-measures;has summarized the technical reformation effect.Result indicates that the long-term stable operatmn days is already increased progressively in the coal gasification plant of the Longyu Coal Chemical-Engineering Company Ltd. along with....